Skip to content

Lift engineering · Est. 2004

We are exclusive
lift contractors with
significant reach and height.

We specialise in the design, installation and maintenance of residential and industrial lifts and elevators, with unparalleled service and warranties. Our technicians and engineers are certified and we only use top quality parts and components.

Lift in operationOn site today
02Client base

Park Lane
to NHS.

Lift contractors with significant reach. The buildings we work in range from prestigious Park Lane addresses and NHS hospitals to hotels, embassies, temples and churches.

  • 01Prime residentialNew installations in prestigious Park Lane buildings and prime London residences, where finish and discretion matter as much as the engineering.
  • 02HealthcareNHS hospitals, where a lift out of service is a clinical problem and every visit has to work around live wards.
  • 03HotelsPassenger and goods lifts in working hotels, maintained around occupancy rather than around our calendar.
  • 04EmbassiesDiplomatic buildings with access, vetting and confidentiality requirements that most contractors are not set up to meet.
  • 05Temples & churchesPlaces of worship and listed buildings, where access and platform lifts have to be introduced without harming the fabric.
  • 06Commercial & industrialOffices, business parks and industrial sites running goods, vehicle and passenger lifts under one maintenance contract.
03Programme

Six stages. You get the Lift Cert and SAFED certification and the O&M manual before we leave site.

  1. 01

    Consultation

    A quick call to scope the building, lift type, and rough timeline.

  2. 02

    Site Survey

    An engineer measures the shaft and confirms what's actually possible.

  3. 03

    Design & Quote

    A fixed-price proposal with drawings, specs, and a firm programme.

  4. 04

    Installation

    The engineer who quoted the job is the one who carries it out.

  5. 05

    Testing & Handover

    LIFT CERT and SAFED certification and full O&M documentation before we leave.

  6. 06

    Ongoing Maintenance

    Scheduled servicing keeps it compliant and running for years.

Next step

Book an appointment with us today.

Send the lift type, the building, and roughly when you need it done. A lead engineer replies within two working days.